Received a nabovarsel, a notice of a neighbour’s building plans? Read the attachments, find the response deadline and send any comments to the person applying to build. You should normally have at least two weeks to respond. Confirming receipt does not mean you consent to the plans.
What does the neighbour notice mean?
A neighbour notice tells you that a neighbour plans to build, demolish or alter something. It lets you explain how the plans affect you before the municipality considers the building application.
The rules were checked on 2 November 2026. SamfunnPrep also has an overview of articles about Norwegian services.
The notice is not building permission. Nor does it require you to approve the project. Read what you are actually being asked to sign or answer.
These four actions have different meanings:
| Action | What do you do? | What does it mean? |
|---|---|---|
| Acknowledge receipt | Confirm that the notice has reached you | You have received the information |
| Give consent | Say yes to the matter covered by the consent | You accept more than mere receipt |
| Submit comments | Describe concerns or disadvantages | The applicant must include your comments with the application |
| Appeal a decision | Request reconsideration after the municipality’s decision | This is a later stage with separate rules |
Bærum municipality’s guidance on neighbour notices explains the distinction between comments before a decision and an appeal afterwards. Do not sign consent that you do not understand. First ask what the wording covers.
Find the letter and all attachments
The notice may arrive through Altinn, by registered post, at your door, by email or by text message. In Altinn, open the actual message to see the documents. A brief alert that you have received mail is not enough to assess building plans.
Find the property address, the contact person’s name and where to send your response. Also look for the date the notice was sent. Consider keeping the letter, drawings and your response in a separate folder.
If an attachment will not open, ask the contact person for a readable copy. Specify what is missing, such as the drawing showing the height facing your home. Do not guess what the building will look like from a short description alone.
When does the response period begin?
The deadline must be at least two weeks after the notice has been sent and necessary documentation made available. This is stated in the guidance to section 5-2 of the Building Application Regulations, SAK10. If the applicant gives a longer deadline in the notice, that deadline applies.
Altinn and registered post: The starting point is the date the notice was sent. The period does not begin only when you open the message or collect the letter. You do not need to acknowledge receipt for these delivery methods.
At your door, by email or by text: You must acknowledge receipt in writing for this notification to be valid. An automatic read receipt is not enough. Once receipt is acknowledged, the period is counted from handover or sending, not from the day you wrote the acknowledgement.
Your comments must be received by the deadline. Direktoratet for byggkvalitet, the Norwegian Building Authority, explains delivery methods and deadlines. Put the date in your calendar and send well in advance if you want to comment.
Is necessary documentation missing, or does the deadline seem too short? Contact the applicant immediately for clarification. If you need more time, ask for a written reply too. Do not assume that asking alone has given you a new deadline. The municipality can advise if you disagree about the notification.
What should you examine in the plans?
Check where the building will stand, its size and how it will affect your property. The documentation should enable you to assess this.
The notice must contain relevant drawings and information. If the project needs a dispensasjon, an exemption from a provision, it must identify the provision concerned. If the exemption affects neighbours’ interests, the reasons must be included.
Use this checklist while reading:
- Which side of the plot will be built on?
- Does the drawing clearly show dimensions, position and height?
- Do windows, a balcony or other parts face your home?
- Is it unclear how light, privacy or views will be affected?
- Do the description and drawings differ?
These questions help you understand the case; they are not a list of circumstances that automatically lead to refusal. Note which documents your questions concern, preferably with drawing number and date.
How do you write comments?
Send comments to the neighbour or responsible applicant, as stated in the notice. The responsible applicant handles the application with the municipality. Oslo municipality explains that comments accompany the building application. You should therefore normally send them to the applicant rather than directly to the municipality.
Describe the specific problem and what you want considered. You can suggest a different position or design. Distinguish what you can see in the drawings from what you need more information about.
Here is a fictional example of a short comment:
I refer to the neighbour notice for the address in the letter. The drawing dated [date] shows a balcony facing my living-room window. I am concerned about overlooking. I ask you to consider its position or screening. Could you also explain the height marked on the drawing? Please confirm receipt of my comments.
Adapt the wording to your case. Add your name, address and contact details, and identify the correct project. Keep what you send. A clear question is more useful than a general claim that the entire project is unlawful.
What happens after you respond?
The applicant must send the comments to the municipality with the application and explain how they were considered. The applicant may also change the plans. Changes may require a new neighbour notice.
Direktoratet for byggkvalitet’s guidance for applicants describes this responsibility. Disagreeing does not give you a veto. The municipality assesses the project under the applicable rules.
Follow the case and read the municipality’s decision. If you think it is wrong, read the appeal information in the decision. Your earlier comments do not automatically constitute an appeal against a later decision.
What if the notice arrives late or does not reach you?
If registered post reaches you only after the response deadline because of a postal failure, the notice is nevertheless valid. Contact the municipality handling the case promptly if you have comments.
If you live in a condominium association or housing cooperative with a board, the board may receive the notice. Tenants are not notified in the same way as owners and leaseholders of land. Ask the board or landlord for the documents if a building project affects your home.
Not receiving a separate letter therefore does not prove that the notification was defective. The municipality can help clarify the situation. SamfunnPrep’s practical tools can help you understand Norwegian terms and procedures.



